At a recent data centre industry event I attended, one subject dominated the conversation: power.
Where will the electricity required by the next generation of data centres come from, and can the infrastructure be delivered quickly enough to support the growth in artificial intelligence?
These questions are reshaping the data centre map. More than 80% of the UK’s commercial data centre capacity remains concentrated around London, one of the country’s most challenging regions for power availability. As AI increases demand for larger facilities and higher-density computing, developers are looking more closely at regions offering power, suitable sites and delivery expertise.
That combination of power, place and supply-chain capability puts the North East among the leading regions for future AI infrastructure.
Power is the first piece of the jigsaw. Data centres are among the UK’s most energy-intensive developments. However, the North East’s industrial legacy of power stations, chemical plants and steelworks has left substantial high-voltage grid infrastructure. Alongside the region’s offshore wind sector, this offers an advantage for major AI developments.
Supply must also be resilient. Even a brief interruption can have serious financial and operational consequences, so standby generation, uninterruptible power supplies and other critical power systems must be engineered in from the outset.
As a North East-based critical power specialist, Durata is directly involved in these conversations. Through sector briefings and engagement with businesses bringing forward major power requirements, I have seen Northern Powergrid working to understand future demand and begin discussions early. That does not remove the scale of the challenge, but it is the proactive approach credible projects need.
The second piece is place. The North East combines strong digital connectivity and an established energy and engineering ecosystem with large brownfield sites ready for redevelopment. Its designation as an AI Growth Zone, centred on Cambois and Cobalt Park, reflects those advantages and could unlock up to £30 billion of private investment and more than 5,000 jobs.
Those are significant numbers, but success must also create lasting expertise and long-term economic growth.
The third piece is supply chain. Industry research shows growing concern among data centre operators about access to critical equipment and skilled people, while AI infrastructure is becoming more technically demanding. More than half are struggling to find qualified staff.
Projects therefore need experienced businesses across engineering, critical power, cooling, construction and commissioning.
The challenge is having the equipment, expertise and people available to deliver at the speed the industry demands.
The North East has repeatedly responded to industrial change. It was the supply-chain cornerstone of railways, shipbuilding and oil and gas. More recently, regional businesses have applied their engineering, manufacturing and project-delivery expertise to offshore wind, advanced manufacturing and life sciences. Digital infrastructure can become the next chapter.
The QTS data centre campus at Cambois shows how the three elements can come together. Planned for the former Blyth Power Station site, it represents investment of up to £10 billion and is expected to become one of Europe’s largest data centre campuses.
Drawing on our experience of supporting data centre developments across the UK and internationally, Durata is delivering preparatory works on the site. It is significant to see specialist expertise developed in the North East applied to a major project within our region.
Regional procurement can spread that investment further, creating opportunities for established suppliers and helping more businesses build credentials to compete elsewhere. Our ambition should be to support regional projects, then export that expertise nationally and internationally.
This is one reason Durata became a founding member of the North East Data Centre Hub.
It brings businesses together to share best practice, identify collaboration opportunities and strengthen regional capability. Guests now attend its events from across the UK, showing that the industry is recognising what is being created here.
Growth must also carry public confidence. Legitimate questions are being asked about electricity and water use, environmental effects, land requirements and permanent jobs. With several developments proposed in South East Northumberland, there are concerns about overdependence on one form of investment.
Developers must respond with evidence, openness and meaningful local benefits through responsible infrastructure planning, regional procurement, investment in skills and honest community engagement. Government, local authorities, network operators and industry must assess developments collectively rather than in isolation.
The North East has the component parts required to lead in AI infrastructure. If we connect them successfully, the region will provide more than sites for data centres. It will supply the resilient power systems, skilled people and engineering expertise on which the AI economy depends.